Posted By: gollygee
I think the new pen is finished. - 09/06/12 12:01 AM
Overall view of my new pen:
Construction of pen, each panel is one 16' hog panel, 1 inch 16 ga. square tubing. The connectors with holes were to be staked into the ground, this has not been necessary. No hogs or cows in the pen and no obvious attempts so far:
Water station - left rear of pen. 330 gallon tote and an Attwood's pet water pan. Unseen are 3 bags of sand in the tire to act as a heat sink and anchor. The shade tarps may have been a bit of overkill. Deer are using about 100 gallons per month so far:
Tripod/feeder:
Camera:
Deer minerals (to the right of the water station):
[img]http://i596.photobucket.com/albums/tt44/jrmurry/Feederpen020.jpg[/img]
Construction of pen, each panel is one 16' hog panel, 1 inch 16 ga. square tubing. The connectors with holes were to be staked into the ground, this has not been necessary. No hogs or cows in the pen and no obvious attempts so far:
Water station - left rear of pen. 330 gallon tote and an Attwood's pet water pan. Unseen are 3 bags of sand in the tire to act as a heat sink and anchor. The shade tarps may have been a bit of overkill. Deer are using about 100 gallons per month so far:
Tripod/feeder:
Camera:
Deer minerals (to the right of the water station):
[img]http://i596.photobucket.com/albums/tt44/jrmurry/Feederpen020.jpg[/img]